翻訳と辞書
Words near each other
・ Bromeswell Green
・ Bromethalin
・ Brome—Missisquoi
・ Bromfenac
・ Bromfield
・ Bromfield (Cumbria) railway station
・ Bromfield (surname)
・ Bromfield baronets
・ Bromfield Priory
・ Bromfield, Cumbria
・ Bromfield, Shropshire
・ Bromford
・ Bromford Bridge Racecourse
・ Bromford Bridge railway station
・ Bromford Group
Bromford Junction
・ Bromford Viaduct
・ Bromfords School
・ Bromhall
・ Bromhall Priory
・ Bromham
・ Bromham and Rowde Halt railway station
・ Bromham, Bedfordshire
・ Bromham, Wiltshire
・ Bromhead
・ Bromhead baronets
・ Bromhead, Saskatchewan
・ Bromheadia
・ Bromheadia brevifolia
・ Bromheadia finlaysoniana


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Bromford Junction : ウィキペディア英語版
Bromford Junction

Bromford Junction () is a canal junction at the foot of the Spon Lane Locks where the Spon Lane Locks Branch meets the BCN New Main Line near Oldbury in the West Midlands, England.
==History==
The location of the junction was originally on the Wednesbury Canal, a branch of the Birmingham Canal which had been authorised by Act of Parliament in 1768. Because there were collieries at Wednesbury, the branch and the section of the main line from it to Birmingham was opened first, in 1769, and a lucrative trade in coal developed. Between the junction site and Birmingham was a ridge of land, and the six Spon Lane Locks were situated to the east of the site, to raise the line from to the summit level of . At Smethwick, another six locks dropped the canal to the same level, known as the Birmingham Level. The rest of the main line left Spon Lane Locks between the third and fourth lock, at the Wolverhampton Level, and maintained that level to Wolverhampton, where it dropped through twenty locks (later increased by one) to reach the Staffordshire and Worcestershire Canal at Autherley Junction. This section was completed in 1772.
The locks up and over the Smethwick summit caused problems with congestion and with water supply, and in the 1790s, a new cut was made at the Wolverhampton Level, which removed the need for three of the locks at both ends of the summit. This did not alleviate the problem entirely, and in 1825 the engineer Thomas Telford was commissioned to improve the main line. His canal, like others he built, cut across country in as straight a line as possible, using embankments, cuttings and tunnels where necessary to maintain a level. His new main line left the old one at Factory Locks, where three locks dropped the canal to the Birmingham Level, and followed a straight path to Pudding Green Junction, where it intersected the Wednesbury Canal. The old line of that canal between the intersection and Bromford Junction was widened and straightened, and became part of the main line, leaving a shortened Wednesbury Old Canal. To avoid the locks over Smethwick Summit, Telford built a huge cutting, up to deep in places, slightly to the south of the original line. The old line from the top of the remaining three locks at Spon Lane was carried over it at Stewart Aqueduct. Two junctions were created to maintain the connections, Bromford Junction at the west end of the cutting and Smethwick Junction at the east end. The bypass was opened on 18 December 1829, and when the new main line was completed, it reduced the length of James Brindley's winding contour canal by to .

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Bromford Junction」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.